VALUE
WORKS
Insights to Results
Help Center
Academy
Sign in
Module 9 · OKR
Module quiz
12 items drawn at random from a bank of 12 · pass mark 75% · unlimited retakes
1. A key result has a KPI selected, but "Link progress to KPI" is unchecked. What does that combination actually mean?
The KPI selection is ignored entirely
Choosing a KPI without checking the box is not possible — the product forces them together
It's rejected — checking the box is mandatory once a KPI is chosen
The KPI stays attached for reference, but Start, Target and Actual remain plain fields someone fills in by hand
2. A key result's KPI was swapped out last week and nobody knows who did it. Which view answers that, and what does it show alongside the change?
OKR Team Analytics View — it shows which team made the change
Objectives Overview — the network icon reveals the editor
OKR Listview — the Updated column names the editor
OKR Change Log View — Editor, the Action taken, and the Old Value alongside the New Value
3. You want to roll forward Finance's OKRs into Q4, but not HR's or Marketing's yet. What's the right approach?
Use Move for Finance and Copy for the others in the same dialog
Change the quarter selector at the top of the OKR Overview page
Impossible — the dialog always rolls forward every department at once
Open Finance's own OKR view and run the Copy Department OKRs dialog for it alone — the dialog only ever touches the department selected in it
4. Which view shows every objective's key-result table run together in one scroll, instead of one objective at a time?
OKR Change Log View
Objectives Overview
OKR Listview
OKR Team Analytics View
5. "Reduce customer churn to under 3% by Q4" — which of the three is this?
Key result — measurable, with a target and a deadline
Milestone
Owner
Objective
6. What does an OKR Scheduler reminder actually configure?
Automatic archiving of objectives at year end
A scheduled email — recipient, linked page, message, frequency, due date and send-ahead timing
A recurring calendar meeting
Which KPI a key result links to
7. Where do you add or delete an objective, key result or milestone?
My Dashboard
Query Builder
Execution → OKR
The OKR Scheduler
8. A key result table shows Progress at 82% and Status as "At risk". What's the right read?
The number looks fine, but the status reflects a judgement call the percentage doesn't capture — worth asking the owner why
The table has an error — these can't both be true
Progress always overrides Status, so treat it as on track
At risk always overrides Progress, so treat it as near 0%
9. Besides Execution, where else can you see a key result's progress?
Query Builder
My Dashboard, under related OKRs
The Systems page
Nowhere else
10. "Ship the self-serve onboarding flow" — a single, dated deliverable on the way to a bigger key result. Which is it?
Objective
Milestone
Department
Key result
11. A key result has a KPI chosen and "Link progress to KPI" checked. Which field updates on its own as new figures land?
Actual
Status
Nothing — checking the box only changes what's displayed, not what's stored
Responsible
12. A key result was only half-achieved and genuinely needs to continue with the same target next quarter. Copy or move?
Neither — start a brand new, unrelated objective
Delete it and recreate manually each quarter
Move — it carries the same unfinished objective into the new quarter
Copy, and ignore the old one
Submit answers