Building an investor report
Create a report and give it a clear structure before adding content.
A good report starts as an ordered argument, not as a pile of charts.
Open Investor Reporting and choose Create new report. ValueWorks creates a draft report shell with a default name and Section 1. Rename the report with the pencil beside its title before you start filling it.
Use + Add section for each distinct part of the story. Rename sections so readers can scan the structure, then use the Sort sections button in the top action bar — the icon shows two vertical arrows, one pointing up and one pointing down — to arrange them. A practical order is: executive summary, performance and variance, operational drivers, outlook, risks and decisions required.
Build the shell first. It is much easier to notice a missing part of the story when the section list is visible than after content has accumulated.

- 1The rename pencil beside the title
- 2Created by, Created at, Status, Recipients
- 3Section tabs, and + Add section at the end
- 4Download, Approve, Recipients, Sort sections, Delete, Create new report — the top action bar
- 5Type set to Text, with the rich-text editor open beneath it
ValueWorks 2026.08
Takeaways
Create the report shell.
Name the report.
Add, rename and sort sections.
Choose each section's type and fill it.
Surfaces covered
- Investor reporting
Also taught in the Academy
Module 8 · Explain and report
Take it as lesson 8.1 in Business Analyst & FP&A